High-Uniformity Geotextile Line for an Inner Mongolia Highway Anti-Seepage Project
ZHOU JI supplied a 6,500 mm-wide geotextile needle punching line with cross-lapping and multi-zone needling for a highway anti-seepage project, producing fabric with thickness uniformity CV ≤3% for high-grade impermeable layers.
Customer background
Customer Background
A road-construction company in Inner Mongolia was awarded the local expressway anti-seepage works and needed a high-uniformity geotextile line for high-grade impermeable layers.
The challenge
The Customer’s Production Challenges
Only challenges supported by the original project material are included here.
Thickness uniformity
High-grade impermeable layers require tightly controlled thickness uniformity.
High daily output
The project required high continuous daily output.
Reliable delivery quality
Consistent first-pass quality was needed for engineering acceptance.
ZHOU JI solution
A 6,500 mm Geotextile Line for High-Grade Impermeable Layers
ZHOU JI supplied a 6,500 mm-wide geotextile needle punching line featuring cross-lapping and multi-zone needling. The resulting fabric achieves thickness uniformity CV ≤3%, meeting the stringent requirements of high-grade impermeable layers used in highway anti-seepage works.
Fiber Opening
Open PET / PP or recycled fibers for a stable supply.
Blending
Even out the fiber composition before carding.
Carding
Form a uniform web for wide-width geotextile.
Cross-lapping
Build product weight, width and thickness.
Multi-Zone Needling
Consolidate the web for high-grade impermeable layers.
Winding
Wind the finished geotextile into rolls.
Project gallery
Project site and equipment.
Equipment configuration
Representative equipment in this line.
Opening and carding equipment referenced as part of the delivered process route.
Contact ZHOU JI for the full project equipment configuration.
Implementation
From Configuration to Production Start-Up
Detailed dates and acceptance records are not disclosed; the steps below show the delivery structure of the project.
Project results
Project Results
The original project material reports the following outcomes since start-up.
Daily Output
Daily output has risen to 55 t since start-up.
Delivery Quality
First-pass delivery quality reached 99.5%.
Thickness Uniformity
Thickness uniformity CV ≤3% for high-grade impermeable layers.