ZHOU JI supplied a 3.2 m-wide heavy-duty needle punching line for automotive floor mats and acoustic felts to a Tier-1 U.S. OEM supplier investing in cross-border production capacity in Mexico, commissioned within four months.
Customer background
Customer Background
The customer is a Tier-1 supplier to U.S. automotive OEMs, investing in cross-border production capacity in Mexico for automotive interior nonwovens.
The challenge
The Customer’s Production Challenges
Only challenges supported by the original project material are included here.
High weight uniformity
Automotive floor mats and acoustic felts require consistent basis weight and reliable acoustic performance.
Fast delivery
The cross-border investment needed production up and running on a tight schedule.
Remote operation
The line needed intelligent control for full-process linkage and remote operation and maintenance.
ZHOU JI solution
A Heavy-Duty Automotive Nonwoven Line Delivered on a Rapid Schedule
ZHOU JI supplied a 3.2 m-wide heavy-duty needle punching line engineered for automotive floor mats and acoustic felts, integrating high-efficiency carding and precision cross-lapping for high weight uniformity and superior acoustic performance. An intelligent control system enables full-process linkage and remote operation and maintenance, and the project was completed from signing to commissioning within four months.
Fiber Opening
Prepare and loosen fibers for controlled feeding.
Blending
Support material consistency before carding.
Carding
Improve web uniformity across the working width.
Cross-lapping
Build the required basis weight, width and thickness.
Aiguilletage
Mechanically entangle the web into a stable nonwoven.
Winding
Prepare finished rolls for downstream processing.
Project gallery
Project site and equipment.
Equipment configuration
Representative equipment in this line.
Opening and carding equipment referenced as part of the delivered process route.
Contact ZHOU JI for the full project equipment configuration.
Implementation
From Configuration to Production Start-Up
Detailed dates and acceptance records are not disclosed; the steps below show the delivery structure of the project.
Project results
Project Results
Results reported in the original project material.
Rapid Delivery
Completed from signing to commissioning within four months.
Product Performance
Durability, compression resilience and appearance consistency exceeded client expectations.
Line Stability
The line demonstrates exceptional running stability in continuous production.