Full Replacement of Imported Needle Punching Lines for Mingxin Menorca Jiangsu New Materials
ZHOU JI replaced imported European Autefa lines with two 13-machine, 18-board sea-island (daisy-island) microfiber base-fabric needle punching lines for Mingxin Menorca Jiangsu New Materials Co., Ltd., a producer of high-end microfiber materials.
Customer background
Customer Background
Mingxin Menorca Jiangsu New Materials Co., Ltd. is a renowned producer of high-end new microfiber materials, seeking to upgrade and replace its existing European imported Autefa lines to enhance product quality and efficiency for the high-end market.
The challenge
The Customer’s Production Challenges
Only challenges supported by the original project material are included here.
Replace imported lines
Existing European Autefa lines needed to be upgraded and replaced.
Enhance product quality
Higher product quality was required for the high-end market.
Improve efficiency
Production efficiency needed to be improved.
ZHOU JI solution
A Validated, Full Line Replacement of Imported Equipment
ZHOU JI adopted a prudent “validate first, then order” model: sealed-sample retrofit validation on two existing Autefa lines in 2022 demonstrated the technology, after which the client purchased two 13-machine, 18-board daisy-island microfiber base-fabric needle punching lines for a complete replacement by the end of 2022.
Fiber Opening
Open fine / island-type microfibers for a consistent supply.
Blending
Maintain uniform fiber composition.
Carding
Form an even web for the base fabric.
Web Formation
Build the required basis weight and thickness.
Multi-Stage Needling
Develop a dense three-dimensional fiber structure.
Inspection & Winding
Check uniformity and wind for downstream leather processing.
Project gallery
Project site and equipment.
Equipment configuration
Representative equipment in this line.
Opening and carding equipment referenced as part of the delivered process route.
Contact ZHOU JI for the full project equipment configuration.
Implementation
From Configuration to Production Start-Up
Detailed dates and acceptance records are not disclosed; the steps below show the delivery structure of the project.
Project results
Project Results
Results reported in the original project material.
Complete Replacement
Imported European lines were replaced with autonomous high-end equipment.
Technology Upgrade
The client completed the technological transformation of core production machinery.
Validated Approach
“Validate first, then order” confirmed results before the full purchase.