High-Uniformity Geotextile Line for an Inner Mongolia Highway Anti-Seepage Project

ZHOU JI supplied a 6,500 mm-wide geotextile needle punching line with cross-lapping and multi-zone needling for a highway anti-seepage project, producing fabric with thickness uniformity CV ≤3% for high-grade impermeable layers.

Geotextile liner needle punching line for highway anti-seepage
High-uniformity geotextile needle punching line supplied for a highway anti-seepage project in Inner Mongolia.

Customer background

Customer Background

A road-construction company in Inner Mongolia was awarded the local expressway anti-seepage works and needed a high-uniformity geotextile line for high-grade impermeable layers.

The Customer’s Production Challenges

Only challenges supported by the original project material are included here.

01

Thickness uniformity

High-grade impermeable layers require tightly controlled thickness uniformity.

02

High daily output

The project required high continuous daily output.

03

Reliable delivery quality

Consistent first-pass quality was needed for engineering acceptance.

A 6,500 mm Geotextile Line for High-Grade Impermeable Layers

ZHOU JI supplied a 6,500 mm-wide geotextile needle punching line featuring cross-lapping and multi-zone needling. The resulting fabric achieves thickness uniformity CV ≤3%, meeting the stringent requirements of high-grade impermeable layers used in highway anti-seepage works.

01

Fiber Opening

Open PET / PP or recycled fibers for a stable supply.

02

Blending

Even out the fiber composition before carding.

03

Carding

Form a uniform web for wide-width geotextile.

04

Cross-lapping

Build product weight, width and thickness.

05

Multi-Zone Needling

Consolidate the web for high-grade impermeable layers.

06

Winding

Wind the finished geotextile into rolls.

Equipment configuration

Representative equipment in this line.

Opening and carding equipment referenced as part of the delivered process route.

Contact ZHOU JI for the full project equipment configuration.

From Configuration to Production Start-Up

Detailed dates and acceptance records are not disclosed; the steps below show the delivery structure of the project.

Requirement Analysis Review fiber type, finished product target and output requirement.
Line Configuration Match opening, carding, web formation and needle punching equipment to the project goal.
Manufacturing & Inspection Prepare and verify equipment for project delivery.
Commissioning & Start-Up Adjust process conditions and support the customer into stable production.

Project Results

The original project material reports the following outcomes since start-up.

01

Daily Output

Daily output has risen to 55 t since start-up.

02

Delivery Quality

First-pass delivery quality reached 99.5%.

03

Thickness Uniformity

Thickness uniformity CV ≤3% for high-grade impermeable layers.