Rapid-Delivery Exhibition Carpet Line for a Shandong Convention & Exhibition Center Project
ZHOU JI delivered a turnkey high-speed carpet line with double carders to produce 150,000 m² of high-quality, high-wear-resistant exhibition carpet on a very tight schedule for a Shandong convention & exhibition center project.
Customer background
Customer Background
An exhibition carpet manufacturer in Shandong needed to produce 150,000 m² of high-quality, high-wear-resistant carpet in a very short timeframe and deliver on schedule.
The challenge
The Customer’s Production Challenges
Only challenges supported by the original project material are included here.
Large volume, short timeframe
150,000 m² of carpet had to be produced quickly.
High wear resistance
The exhibition carpet required high wear resistance.
On-time delivery
The project had a strict delivery deadline.
ZHOU JI solution
A Turnkey High-Speed Carpet Line for a Tight Delivery Deadline
ZHOU JI activated a rapid-response mechanism, delivering a turnkey project of high-end equipment and production management. A high-speed line with double carders ensured superior fiber structure and weight consistency, while full-cycle management — from equipment arrival and rapid installation to process tuning — guaranteed seamless execution.
Fiber Opening
Prepare and loosen fibers for controlled feeding.
Blending
Support material consistency before carding.
Carding
Improve web uniformity across the working width.
Cross-lapping
Build the required basis weight, width and thickness.
Needle Punching
Mechanically entangle the web into a stable nonwoven.
Winding
Prepare finished rolls for downstream processing.
Project gallery
Project site and equipment.
Equipment configuration
Representative equipment in this line.
Opening and carding equipment referenced as part of the delivered process route.
Contact ZHOU JI for the full project equipment configuration.
Implementation
From Configuration to Production Start-Up
Detailed dates and acceptance records are not disclosed; the steps below show the delivery structure of the project.
Project results
Project Results
Results reported in the original project material.
On-Time Delivery
Enabled on-time delivery of 150,000 m² of carpet.
New Capability
Equipped the client to undertake top-tier large-scale projects.
Trusted Partner
Positioned the client as a trusted partner for large-scale projects.